What ARF uses
Independently administered durable storage with authenticated, conditional append and retrieval; standard signing primitives
What ARF builds
AuthorityWitness protocol, monotonic sequence/digest validation, durable receipt checkpoint, complete canonical ranges, fresh frontier challenge, post-commit publication gate, restoration/reconstruction and failure tests
ARF Component Borrow-Build Decisions · Solution Design Document §3.7
Publish beyond the writer
The authority service sends committed records to an independently administered witness over an authenticated, conditional interface. The witness returns a signed receipt and exposes canonical history for recovery.
Reconcile before reopening
Recovery compares the reconstructed sequence and digest with the independent witness. Component tests cover the witness functions. Releasing a recovered job also requires reconciling the target’s state.
Acceptance criteria
Closed contracts and authority store
All malformed cases refuse before reservation/effect; exact retry has one event; counters remain nonnegative and bounded.
Evidence to inspect · Database read-only auditor plus target observer; database account roles independently checked.
ARF Solution Design Document · Appendix B
Canonical provenance and evidence admission
One accepted head/event; zero premature receipts; every canonical-field mutation detected; invalid evidence cannot advance qualification.
Evidence to inspect · Independent external anchor and verifier host with no authority-write rights.
ARF Solution Design Document · Appendix B
Migration, backup restore and authority continuity
Zero reopened allowance/revoked authority/deleted data; unresolved state stays fenced; no dispatch before reconciliation.
Evidence to inspect · Read-only invariant scanner plus independent target generations/retained anchors.
ARF Solution Design Document · Appendix B
Witnessed authority reconstruction
Authority history is restored from a point older than witnessed or target progress.
Reconstruct used grants, attempts, budgets, flow, tombstones and fences before reopening; include a witnessed consumed claim with no target invocation
ARF Solution Design Document · §17.2
Independent custody
No usable authority precedes durable independent publication; restrictive local denial begins immediately; durable completion and restoration require the current witness history
ARF Solution Design Document · §17.7